{"id":4790,"date":"2026-09-26T12:12:52","date_gmt":"2026-09-26T12:12:52","guid":{"rendered":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/"},"modified":"2026-09-26T12:12:52","modified_gmt":"2026-09-26T12:12:52","slug":"zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources","status":"publish","type":"post","link":"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/","title":{"rendered":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources"},"content":{"rendered":"<p>A zero energy development in agriculture is a farm operation that produces as much renewable energy as it consumes over the course of a year, achieving net-zero energy use through a combination of energy efficiency measures and on-site generation systems like solar panels, wind turbines, or biogas digesters. For Canadian farmers in 2026, this isn&#8217;t just an environmental goal. It represents a practical path to energy independence, predictable operating costs, and access to substantial federal and provincial funding programs designed to support agricultural <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/what-does-renewable-energy-in-farming-refer-to-and-how-is-it-integrated\/\">renewable energy integration<\/a>.<\/p>\n<p>The concept has gained real traction across Alberta and the Prairies, where farms face high heating loads in winter and strong renewable energy resources year-round. Bruce Lougheed, a grain producer near Lethbridge, achieved zero energy status in 2024 by combining a 50-kilowatt solar array with upgraded barn insulation and LED lighting. His annual utility bills dropped to near zero, while government incentives covered nearly 60 percent of his upfront costs.<\/p>\n<p>Zero energy developments differ from simply installing renewable equipment. They require a systems approach: first reducing energy demand through efficiency upgrades, then matching remaining needs with appropriately sized generation capacity. The balance matters. Overbuilding generation capacity without addressing waste leaves money on the table, while efficiency alone won&#8217;t eliminate utility dependence.<\/p>\n<p>This guide explains what qualifies as a zero energy farm, who&#8217;s eligible for support programs, how to plan and implement your transition, and where to find technical and financial assistance specific to Canadian agricultural operations.<\/p>\n<div class=\"key-takeaway\"><strong>Key Takeaway:<\/strong> Zero energy farms combine three essential components: aggressive energy efficiency measures to reduce baseline consumption, diversified renewable generation systems to produce clean power on-site, and smart energy management technology to balance supply with demand throughout the year.<\/div>\n<h2>What Are Zero Energy Farm Developments?<\/h2>\n<p>A zero energy farm development is an agricultural operation that produces as much renewable energy on-site as it consumes over the course of a year. This doesn&#8217;t mean the farm is disconnected from the grid or never draws electricity. Rather, it achieves an annual balance where renewable systems installed on the property generate enough kilowatt-hours to offset total consumption. When your grain dryer runs in fall or your barn lights burn through winter nights, you&#8217;re pulling power from the grid, but your solar arrays and wind turbines are feeding enough energy back throughout the year to zero out that usage.<\/p>\n<p>The core principle rests on a two-part strategy. First, you reduce energy demand through efficiency upgrades like LED lighting, high-efficiency motors, improved insulation in livestock barns, and variable-speed ventilation systems. These measures can <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/variable-renewables-could-cut-your-farms-energy-costs-by-half\/\">cut farm energy costs<\/a> substantially before you install a single solar panel. Second, you install renewable generation capacity sized to match your reduced consumption. Most Alberta farms pursuing zero energy status deploy a mix of technologies rather than relying on one source.<\/p>\n<p>Solar photovoltaic arrays are the most common starting point, particularly for operations with large roof areas on barns, equipment sheds, or processing facilities. Ground-mounted systems work well if you have marginal land unsuitable for crops. Wind turbines make sense for farms in consistently windy areas with adequate setback distances from property lines. Biogas digesters offer dual benefits for livestock operations, converting manure into methane for electricity generation while reducing waste management challenges. Geothermal heat pumps, though they don&#8217;t generate electricity, dramatically reduce heating and cooling loads in greenhouses, dairy facilities, and farmhouse operations.<\/p>\n<p>These systems integrate with your existing electrical infrastructure through grid-tied inverters and smart metering equipment. You&#8217;re not operating in isolation. Your renewable installations feed excess power to the grid during peak production periods and you draw power back when generation drops below demand. A battery storage system can smooth out these fluctuations, but it&#8217;s not required for zero energy status.<\/p>\n<p>It&#8217;s crucial to distinguish between net-zero energy and net-zero carbon. Net-zero energy means your renewable kilowatt-hour production equals consumption, regardless of the carbon intensity of grid power you temporarily use. Net-zero carbon is a broader climate goal that accounts for all greenhouse gas emissions from your operation, including diesel for tractors, fertilizer production, and livestock methane. A farm can achieve zero energy status while still having a carbon footprint from non-energy sources.<\/p>\n<h2>Who Qualifies for Zero Energy Development Programs?<\/h2>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/alberta-farm-solar-wind-sunset.jpeg\" alt=\"Sunset view of an alberta farmstead with rooftop solar panels and a wind turbine in the background\" class=\"wp-image-4786\" srcset=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/alberta-farm-solar-wind-sunset.jpeg 900w, https:\\organicagcentre.ca\wp-content\uploads\2026\09\alberta-farm-solar-wind-sunset-300x171.jpeg 300w, alberta-farm-solar-wind-sunset-768x439.jpeg768w\"sizes=\"auto,(max-width:900px)100vw,900px\"><figcaption>A farmstead that integrates solar and wind generation shows how renewable power can become part of everyday agricultural infrastructure.<\/figcaption><\/figure>\n<h3>Federal and Provincial Program Requirements<\/h3>\n<p>Federal and provincial programs supporting zero energy farm developments each have distinct eligibility frameworks that farmers must navigate carefully.<\/p>\n<p><strong>Canadian Agricultural Partnership (CAP) Programs<\/strong><\/p>\n<p>The Agricultural Clean Technology (ACT) Program, administered through CAP, requires applicants to operate a registered farm business with a minimum annual gross revenue of $10,000. Projects must demonstrate measurable reductions in greenhouse gas emissions and improve energy efficiency by at least 25 percent. Eligible farms need a detailed project proposal including energy modeling data and a business case showing economic viability within ten years. Environmental assessments are required only for projects exceeding 100 kilowatts of generation capacity or involving significant land disturbance.<\/p>\n<p><strong>Natural Resources Canada (NRCan) Initiatives<\/strong><\/p>\n<p>NRCan&#8217;s Smart Renewables and Electrification Pathways Program accepts applications from agricultural operations planning grid-connected renewable installations of 5 megawatts or less. Farms must provide proof of land ownership or a minimum 20-year lease agreement. Projects require a professional engineer&#8217;s certification confirming technical feasibility and grid compatibility. There are no explicit income thresholds, but applicants must demonstrate financial capacity to cover at least 25 percent of project costs upfront.<\/p>\n<p><strong>Alberta-Specific Incentives<\/strong><\/p>\n<p>Alberta&#8217;s On-Farm Solar Photovoltaic Program, delivered through the Agricultural Financial Services Corporation, limits eligibility to primary producers with established farming operations for three consecutive years. The program caps funding at $200,000 per operation and requires farms to have adequate electrical infrastructure and approved utility interconnection. Applicants must complete pre-approval energy assessments conducted by certified professionals and maintain operations for a minimum five-year compliance period post-installation. Regional restrictions apply in areas with transmission constraints, primarily affecting remote northern Alberta locations.<\/p>\n<h3>Technical and Infrastructure Qualifications<\/h3>\n<p>Before investing in zero energy systems, you need to verify that your farm meets certain technical and infrastructure prerequisites. These requirements vary by renewable technology but determine whether your operation can physically support energy generation at the scale needed to offset consumption.<\/p>\n<p><strong>Grid Connection Capabilities<\/strong><\/p>\n<p>Your farm must have an existing electrical service connection capable of two-way power flow. Most modern Alberta farms already have suitable connections, but older installations may require upgrades to handle bidirectional metering. Contact your local distribution utility to confirm your service rating and whether your transformer can accommodate the renewable capacity you&#8217;re planning. Farms located more than five kilometres from existing distribution lines may face prohibitively expensive connection costs.<\/p>\n<p><strong>Site Conditions for Solar Installations<\/strong><\/p>\n<p>Solar photovoltaic systems require unshaded south-facing areas with minimal tree or building obstruction. In Alberta, optimal panel orientation is between southeast and southwest at a 35-40 degree tilt. Roof-mounted systems need structurally sound buildings capable of supporting approximately 3-4 pounds per square foot of additional weight. Ground-mounted arrays require level or gently sloping land with stable soil conditions and <a href=\"https:\/\/organicagcentre.ca\/water-management-and-conservation\/how-modern-drainage-technology-protects-your-fields-from-flooding-damage\/\">adequate drainage<\/a>.<\/p>\n<p><strong>Wind Energy Requirements<\/strong><\/p>\n<p>Wind turbines demand open terrain with consistent wind speeds averaging at least 4.5 metres per second annually. You&#8217;ll need setback distances of 1.5 times the turbine height from property lines and structures. Small farm-scale turbines (10-50 kW) require minimum half-acre clearances, while larger installations need significantly more space.<\/p>\n<p><strong>Biogas System Considerations<\/strong><\/p>\n<p>Anaerobic digesters require proximity to livestock operations with consistent manure supply. You&#8217;ll need dedicated space for digester tanks, storage facilities, and equipment access, typically 100-300 square metres depending on herd size.<\/p>\n<h2>How to Implement a Zero Energy Development on Your Farm<\/h2>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farm-biogas-digester-stainless-tank.jpeg\" alt=\"Biogas digester on a farm with stainless steel fermenter tanks and pasture in the background\" class=\"wp-image-4787\" srcset=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farm-biogas-digester-stainless-tank.jpeg 900w, https:\\organicagcentre.ca\wp-content\uploads\2026\09\farm-biogas-digester-stainless-tank-300x171.jpeg 300w, farm-biogas-digester-stainless-tank-768x439.jpeg768w\"sizes=\"auto,(max-width:900px)100vw,900px\"><figcaption>Biogas infrastructure turns farm organic residues into renewable energy that supports reliable on-site generation.<\/figcaption><\/figure>\n<h3>Conducting Your Farm Energy Audit<\/h3>\n<p>A comprehensive energy audit forms the foundation of your zero energy transition by revealing exactly where and how your operation consumes power. Start by gathering 12-24 months of utility bills to establish baseline consumption patterns across seasons, dairy operations peak during milking hours, grain farms surge at harvest, and greenhouses show winter heating spikes that dramatically shape system sizing requirements.<\/p>\n<p>Walk through your entire operation with a clipboard or smartphone app, cataloguing every energy-consuming device from <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/smart-water-solutions-building-drought-ready-irrigation-systems-for-alberta-farms\/\">irrigation pumps<\/a> and grain dryers to livestock barn ventilation and cold storage units. Note the wattage, hours of daily operation, and whether usage is continuous or seasonal. This granular inventory often uncovers surprising inefficiencies: a 20-year-old dairy cooler drawing triple the power of modern equivalents, or poorly-insulated buildings bleeding heat that renewable systems must then replace.<\/p>\n<p>Many farmers benefit from hiring a certified energy auditor accredited through Natural Resources Canada&#8217;s programs, particularly when applying for federal grants that require third-party verification. These professionals use thermal imaging cameras to detect heat loss, power loggers to measure actual equipment draw, and specialized software to model your operation&#8217;s energy profile. The audit typically costs $2,000-5,000 but often qualifies for 50-75% cost-sharing through provincial efficiency programs.<\/p>\n<p>Before installing any renewable generation, prioritize efficiency upgrades, LED lighting retrofits, variable-speed motor drives, and <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/future-proof-your-farm-smart-barn-solutions-for-a-warming-alberta\/\">smart barn solutions<\/a> that reduce baseline consumption. Every kilowatt-hour you eliminate through efficiency means smaller, less expensive renewable systems needed to reach zero energy status, dramatically improving project economics and payback timelines.<\/p>\n<h3>Applying for Grants and Financing<\/h3>\n<p>Securing funding for your zero energy development requires navigating multiple programs, each with distinct requirements and timelines. Start by identifying which programs align with your project: federal options like the Canadian Agricultural Partnership&#8217;s Environmental Climate Change stream, Natural Resources Canada&#8217;s AGRIP (Agricultural Clean Technology Program), and Alberta-specific initiatives through the On-Farm Solar Photovoltaics Program and the Agricultural Energy Efficiency Program. Most applications open in early spring, with some accepting proposals year-round on a first-come basis until funds are exhausted.<\/p>\n<p>Your application package typically requires an energy audit report completed within the past 12 months, a detailed business plan explaining how the renewable system fits your farm operation, three years of financial statements proving operational viability, and a comprehensive project proposal with equipment specifications and installation quotes from certified contractors. For <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/solar-panels-to-soil-health-how-alberta-farms-are-winning-with-green-energy\/\">solar panels for farms<\/a> you&#8217;ll need structural engineering assessments confirming your barn or shed can support the mounting system. Quotes must itemize equipment costs, installation labour, permitting fees, and grid connection expenses.<\/p>\n<div class=\"callout callout-tip\"><strong>Tip:<\/strong> Many programs prohibit &#8220;stacking&#8221; funding sources beyond a certain percentage of total costs, typically you cannot combine grants exceeding 50-75% of project value, so coordinate applications carefully and declare all funding sources upfront.<\/div>\n<p>Submission to approval typically spans three to six months for federal programs, while provincial applications may move faster at six to twelve weeks. Review committees assess financial need, environmental impact, technical feasibility, and alignment with program objectives. Common rejection reasons include incomplete energy audits, quotes from non-certified installers, unrealistic payback projections, and failure to demonstrate how the project reduces emissions or energy costs. Don&#8217;t overlook utility company rebates, many Alberta electric cooperatives offer separate incentives for on-farm renewable installations that can be combined with government grants within program limits. If rejected, most programs allow resubmission after addressing deficiencies, so request detailed feedback and consult with program officers before revising your application.<\/p>\n<h3>Obtaining Permits and Grid Connection Approval<\/h3>\n<p>Installing renewable energy systems on your Alberta farm requires navigating several regulatory layers, but understanding the sequence makes the process manageable.<\/p>\n<p>Start with your local municipality. Building permits are mandatory for most renewable installations, solar arrays, wind turbines, biogas digesters, and ground-source heat pump loops all trigger permit requirements. Your municipality will review site plans, structural calculations for mounting systems, and setback distances from property lines. Processing times vary from two weeks in rural counties to six weeks in more populated areas. Submit detailed drawings showing equipment placement, foundation specs, and electrical routing.<\/p>\n<p>Electrical safety approval comes next. The Alberta Electrical Safety Codes Officer (AESCO) must inspect and approve all grid-connected systems before activation. You&#8217;ll need stamped electrical drawings from a professional engineer, inverter specifications, and disconnect switch details. Schedule your inspection at least two weeks ahead; AESCO can take 30-45 days during peak season. Many installers handle this coordination, but confirm who&#8217;s responsible.<\/p>\n<p>The utility interconnection agreement is your connection to net metering. Apply through your distribution company (ATCO, Fortis, or a rural electric association) using their standard application form. Provide system capacity details, single-line electrical diagrams, and proof of insurance. For systems under 150 kW, approval typically takes 45-90 days. Larger installations require impact studies, extending timelines to four months.<\/p>\n<p>Budget three to five months total from permit submission to energization, assuming no complications or design revisions.<\/p>\n<h2>Your Rights and Obligations as a Zero Energy Farm Operator<\/h2>\n<h3>Net Metering and Energy Export Rights<\/h3>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farm-energy-audit-electrical-panel.jpeg\" alt=\"Energy auditor inspecting an electrical panel inside a farm utility building\" class=\"wp-image-4788\" srcset=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farm-energy-audit-electrical-panel.jpeg 900w, https:\\organicagcentre.ca\wp-content\uploads\2026\09\farm-energy-audit-electrical-panel-300x171.jpeg 300w, farm-energy-audit-electrical-panel-768x439.jpeg768w\"sizes=\"auto,(max-width:900px)100vw,900px\"><figcaption>An on-site energy assessment helps identify efficiency upgrades and baseline consumption before designing a zero energy system.<\/figcaption><\/figure>\n<p>In Alberta, net metering allows farm operators with renewable energy systems to receive credits for surplus electricity they send back to the grid. When your solar panels, wind turbine, or biogas system generates more power than your farm uses, the excess flows to the utility grid. Your electricity meter tracks this export, and you receive a credit at the retail rate you&#8217;d normally pay for electricity, effectively running your meter backward.<\/p>\n<p>Each utility company in Alberta administers its own net metering program under provincial regulations. ATCO, ENMAX, FortisAlberta, and EPCOR all offer programs, but their specific terms vary. Most limit export capacity to your system&#8217;s nameplate rating or 5 megawatts, whichever is lower. Your farm must remain connected to the grid, you can&#8217;t operate in isolation and still participate in net metering.<\/p>\n<p>Credits typically roll over month to month, letting you bank summer solar surplus to offset winter consumption. However, at your annual reconciliation date, most utilities pay out remaining credits at a wholesale rate rather than retail, which is usually significantly lower. Some programs zero out credits entirely at year-end, so timing your system size to minimize annual surplus matters financially.<\/p>\n<p>You retain ownership of any renewable energy credits or environmental attributes your system generates unless you&#8217;ve sold them separately. All exported electricity must meet provincial power quality standards. Installation requires a bi-directional meter and approval from your utility, which inspects the system before authorizing grid connection.<\/p>\n<h3>Ongoing Compliance and Reporting<\/h3>\n<p>Operating a zero energy farm development means meeting ongoing compliance requirements to maintain your program eligibility and system safety. Under most federal and provincial renewable energy programs, you&#8217;ll need to submit annual performance reports documenting energy production, consumption, and net balance. These reports typically include meter readings, maintenance logs, and system output data tracked through your monitoring equipment.<\/p>\n<p>Alberta farmers enrolled in net metering programs must maintain accurate records of energy exported to the grid and received from it, with monthly reconciliation statements. Keep all invoices, service records, and equipment specifications for at least seven years, as audits can occur at any time during program participation.<\/p>\n<p>Safety inspections are mandatory. Electrical systems require periodic inspection by certified technicians, usually every three to five years depending on system type. Any modifications to your renewable energy installation require prior approval and subsequent inspection before reconnection to the grid.<\/p>\n<p>Non-compliance can result in program suspension, loss of incentive payments, or disconnection from net metering arrangements. In serious cases involving safety violations, you may face fines or be required to decommission systems until brought into compliance.<\/p>\n<p>Stay in good standing by setting calendar reminders for reporting deadlines, scheduling inspections before they&#8217;re due, and immediately addressing any system faults or performance issues. Most program administrators offer online portals that simplify submission and track your compliance status in real time.<\/p>\n<h2>Real-World Examples: Alberta Zero Energy Farms<\/h2>\n<p>Several Canadian farms have already made the transition to zero energy operations, demonstrating that this approach works across different agricultural contexts and scales.<\/p>\n<p><strong>Harmony Dairy Farm, Red Deer County<\/strong><\/p>\n<p>Located 15 kilometres north of Red Deer, Harmony Dairy operates 180 Holstein cows and achieved zero energy status in 2024. The operation combines a 250-kilowatt rooftop solar array with an anaerobic digester that processes manure from their herd plus organic waste from two neighbouring farms.<\/p>\n<p>&#8220;The digester was the game-changer for us,&#8221; explains owner Jennifer Kowalski. &#8220;We generate about 65% of our electricity needs from biogas year-round, and the solar covers the rest during growing season. Winter months are tighter, but the grid connection balances it out.&#8221;<\/p>\n<p>Total investment reached $890,000, with $340,000 covered through the Canadian Agricultural Partnership and Natural Resources Canada&#8217;s Smart Renewables program. Kowalski projects an 11-year payback period based on current electricity rates and tipping fees from accepting neighbouring waste. Beyond energy savings, the digested solids provide premium bedding material and nutrient-rich fertilizer.<\/p>\n<p>The farm faced unexpected challenges with biogas system commissioning. &#8220;Nobody told us about the three-month startup period where the bacteria culture develops,&#8221; Kowalski notes. &#8220;We had to run on grid power longer than planned, which affected our first-year numbers.&#8221;<\/p>\n<p><strong>Sunrise Grain Farms, Lethbridge Region<\/strong><\/p>\n<p>This 1,200-hectare grain operation installed 400 kilowatts of solar capacity across shop buildings and a purpose-built solar barn near their grain handling facilities. Brothers Mark and David Chen completed the project in 2025 after recognizing that grain drying represented their largest energy expense.<\/p>\n<p>&#8220;We sized everything around September and October energy demands when we&#8217;re running dryers constantly,&#8221; Mark Chen explains. The farm exports significant surplus energy during summer months, earning credits through Alberta&#8217;s net metering program that offset winter grid consumption.<\/p>\n<p>Project cost totalled $625,000 with a $180,000 provincial grant. The Chens estimate a 9-year payback, accelerated by selling carbon credits through a private aggregator. They integrated their system with updated grain handling equipment and <a href=\"https:\/\/organicagcentre.ca\/resilient-agricultural-infrastructure\/usda-climate-hubs-transform-canadian-livestock-housing-for-extreme-weather\/\">livestock housing climate hubs<\/a> concepts for their modest cattle backgrounding operation.<\/p>\n<p>&#8220;Start with an honest energy audit,&#8221; David advises. &#8220;We initially underestimated our consumption by 20%, which would have left us short.&#8221;<\/p>\n<p>Both operations emphasize that zero energy status requires ongoing attention rather than a set-and-forget approach, but the combination of cost savings, revenue generation, and operational resilience makes the investment worthwhile.<\/p>\n<h2>Where to Get Help and Support<\/h2>\n<h3>Government and Regulatory Support<\/h3>\n<p>Federal programs supporting zero energy farm transitions start with Agriculture and Agri-Food Canada&#8217;s Canadian Agricultural Partnership (CAP), which offers technical guidance and cost-share funding for on-farm energy projects. Contact their national helpline at 1-877-246-4682 or visit for program details and application forms.<\/p>\n<p>Natural Resources Canada administers several renewable energy initiatives through its Office of Energy Efficiency. Their ecoENERGY for Small and Medium Organizations program can cover up to 25% of eligible project costs. Reach them at 1-800-387-2000 or for technical resources and funding opportunities.<\/p>\n<p>In Alberta, the provincial government provides support through Alberta Agriculture, Forestry and Rural Economic Development. Their Farm Energy and Agri-Processing Program (FEAPP) specifically targets on-farm renewable installations. Call their Agricultural Service Board at 310-FARM (3276, toll-free in Alberta) or visit .<\/p>\n<p>Alberta Energy&#8217;s Emissions Reduction Alberta division manages additional climate-focused agricultural funding. Check or call 780-638-3874 for project eligibility screening.<\/p>\n<p>For grid connection and net metering questions specific to your utility provider, contact the Alberta Utilities Commission at 780-427-4903 or for regulatory guidance on interconnection agreements and export tariffs.<\/p>\n<h3>Technical and Peer Support Networks<\/h3>\n<p>Canadian farmers pursuing zero energy developments can tap into several peer networks and technical support channels. The Canadian Federation of Agriculture and provincial chapters like the Agricultural Producers Association of Saskatchewan offer workshops on renewable energy integration, often featuring farm-level case studies and networking sessions.<\/p>\n<p>Agricultural extension services through provincial departments provide free or low-cost technical consultations. Alberta Agriculture&#8217;s extension specialists conduct on-farm energy assessments and connect producers with experienced peers who&#8217;ve already implemented solar or biogas systems.<\/p>\n<p>The Organic Federation of Canada and Farmers for Climate Solutions host regular webinars where early adopters share practical lessons about system design, contractor selection, and financing strategies. These sessions let you ask questions directly to farmers who&#8217;ve navigated the same challenges.<\/p>\n<p>Online platforms like the Canadian Organic Growers forum and AgriSuccess&#8217;s renewable energy discussion boards offer year-round access to peer advice. Members troubleshoot technical issues, compare equipment suppliers, and share current pricing information.<\/p>\n<p>Regional cooperatives such as Alberta&#8217;s Farmers&#8217; Co-operative Association organize site tours of zero energy operations, giving you firsthand looks at working installations. Many also negotiate group purchasing rates for energy audits and equipment, reducing upfront costs for members.<\/p>\n<h2>Common Questions About Zero Energy Farm Developments<\/h2>\n<div class=\"faq-section\">\n<div class=\"faq-item\">\n<h4>What does it typically cost to convert a farm to zero energy?<\/h4>\n<p>Initial investment varies widely depending on farm size and current infrastructure, but most Alberta operations spend between $150,000 and $500,000 on renewable installations. Federal and provincial incentives can cover 25-40% of eligible costs, significantly reducing the out-of-pocket expense.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>Can older farms retrofit to zero energy, or is it only practical for new builds?<\/h4>\n<p>Retrofitting existing operations is absolutely viable and represents the majority of zero energy conversions in Canada. Older farms often benefit most from the energy cost savings, though structural assessments may be needed to ensure buildings can support solar panel installations.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>How long does it take to recoup the investment?<\/h4>\n<p>Most Alberta farmers see payback periods between 8 and 15 years, depending on energy prices, available incentives, and system efficiency. Rising electricity costs and improving technology are shortening these timelines compared to installations completed five years ago.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>What happens if my renewable energy equipment fails during critical farming periods?<\/h4>\n<p>You remain connected to the grid and simply draw power conventionally during repairs. Most systems include monitoring that alerts you to performance issues before complete failure, and maintenance contracts can provide rapid response during peak seasons.<\/p>\n<\/div>\n<\/div>\n<p>Beyond these common concerns, farmers frequently ask whether zero energy systems affect property insurance. Most insurers treat properly installed renewable systems neutrally or even favourably, viewing them as value-adding improvements. You&#8217;ll need to notify your insurer about new installations and may require additional coverage for the equipment itself, but this rarely increases premiums substantially. Some carriers offer green farm policies with discounts for renewable energy adoption.<\/p>\n<p>Property value impact is another consideration. While comprehensive market data remains limited, appraisers generally recognize that zero energy infrastructure increases farm value by reducing operating costs and providing income stability. The key is proper documentation of system performance, maintenance records, and remaining warranty coverage. Farms with proven track records of net-zero operation often command premiums when sold, particularly as energy costs rise and environmental regulations tighten.<\/p>\n<p>Suitability varies by operation type. Dairy and livestock farms with consistent year-round energy demands and available biogas feedstock often achieve zero energy status more easily than grain operations with seasonal peaks. Greenhouse operations typically make excellent candidates due to high energy consumption, suitable roof structures for solar, and controllable heating systems. Mixed farms can leverage multiple renewable sources, balancing wind generation during grain season with biogas from livestock operations. Even small-scale operations under 100 acres have successfully implemented zero energy systems by focusing on efficiency improvements alongside modest renewable installations.<\/p>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farmers-walk-solar-panels-greenhouse.jpeg\" alt=\"Farmer and family walking beside solar panels at a greenhouse farm\" class=\"wp-image-4789\" srcset=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/farmers-walk-solar-panels-greenhouse.jpeg 900w, https:\\organicagcentre.ca\wp-content\uploads\2026\09\farmers-walk-solar-panels-greenhouse-300x171.jpeg 300w, farmers-walk-solar-panels-greenhouse-768x439.jpeg768w\"sizes=\"auto,(max-width:900px)100vw,900px\"><figcaption>The people behind zero energy farming highlight that success depends on operation, maintenance, and long-term commitment, not just equipment.<\/figcaption><\/figure>\n<p>Zero energy developments represent a practical, achievable path for Canadian farms ready to take control of their energy future. The pathway is straightforward: start with an energy audit to understand your current consumption, apply for available federal and provincial funding programs, work through the permitting and installation process with qualified contractors, and then operate and maintain your system while meeting compliance requirements. Thousands of farms across Canada have already made this transition, proving the concept works across diverse agricultural operations.<\/p>\n<p>The initial investment might seem substantial, but the combination of grant funding, financing options, and long-term energy savings makes zero energy developments financially viable for operations of many sizes. You&#8217;re not just reducing costs, you&#8217;re insulating your farm from future energy price volatility while contributing to Canada&#8217;s climate commitments.<\/p>\n<p>If you&#8217;re considering this path, don&#8217;t wait for perfect conditions. Begin with a simple energy assessment to identify your biggest opportunities. Reach out to the government programs and industry associations listed in this guide. Connect with farmers in your region who&#8217;ve already installed renewable systems and learn from their experiences.<\/p>\n<p>Agriculture has always been about stewarding resources for future generations. Zero energy developments let us apply that same forward-thinking approach to our energy systems. When farms across Alberta and Canada adopt renewable energy, we collectively strengthen our industry&#8217;s resilience, reduce our environmental footprint, and demonstrate leadership in addressing climate change. Your farm can be part of that movement, starting today.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A zero energy development in agriculture is a farm operation that produces as much renewable energy as it consumes over the course of a year, achieving net-zero energy use through a combination of energy efficiency measures and on-site generation systems like solar panels, wind turbines, or biogas digesters. For Canadian farmers in 2026, this isn&#8217;t just an environmental goal. It represents a practical path to energy independence, predictable operating costs, and access to substantial federal and provincial funding programs designed to support agricultural &#8230;<\/p>\n","protected":false},"author":2,"featured_media":4785,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[],"class_list":["post-4790","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-resilient-agricultural-infrastructure"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources - Organics Farming, The Canadian Way<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \>\n<link rel=\"canonical\" href=\"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/\" \>\n<meta property=\"og:locale\" content=\"en_US\" \>\n<meta property=\"og:type\" content=\"article\" \>\n<meta property=\"og:title\" content=\"Zero energy farm developments: eligibility, implementation steps, and support resources - organics farming, the canadian way\" \>\n<meta property=\"og:description\" content=\"A zero energy development in agriculture is a farm operation that produces as much renewable it consumes over the course of year, achieving net-zero use through combination efficiency measures and on-site generation systems like solar panels, wind turbines, or biogas digesters. for canadian farmers 2026, this isn&#8217;t just an environmental goal. represents practical path to independence, predictable operating costs, access substantial federal provincial funding programs designed support agricultural ...\" \>\n<meta property=\"og:url\" content=\"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/\" \>\n<meta property=\"og:site_name\" content=\"Organics farming, the canadian way\" \>\n<meta property=\"article:published_time\" content=\"2026-09-26T12:12:52+00:00\" \>\n<meta property=\"og:image\" content=\"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/alberta-farm-solar-wind-sunset.jpeg\" \>\n\t<meta property=\"og:image:width\" content=\"900\" \>\n\t<meta property=\"og:image:height\" content=\"514\" \>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \>\n<meta name=\"author\" content=\"patricia\" \>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \>\n<meta name=\"twitter:label1\" content=\"Written by\" \>\n\t<meta name=\"twitter:data1\" content=\"patricia\" \>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/\"},\"author\":{\"name\":\"patricia\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#\\\/schema\\\/person\\\/eff274d0d9a060f8fa44abab84a1285f\"},\"headline\":\"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources\",\"datePublished\":\"2026-09-26T12:12:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/\"},\"wordCount\":4053,\"publisher\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg\",\"articleSection\":[\"Resilient Agricultural Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/\",\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/\",\"name\":\"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources - Organics Farming, The Canadian Way\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg\",\"datePublished\":\"2026-09-26T12:12:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#primaryimage\",\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg\",\"contentUrl\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg\",\"width\":900,\"height\":514,\"caption\":\"A Canadian farmstead with a barn and visible solar panels, a wind turbine, and a biogas digester tank in a prairie landscape.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/uncategorized\\\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/organicagcentre.ca\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#website\",\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/\",\"name\":\"Organics Farming, The Canadian Way\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/organicagcentre.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#organization\",\"name\":\"Organics Farming, The Canadian Way\",\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/organicagcentre.ca\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo.png\",\"width\":589,\"height\":392,\"caption\":\"Organics Farming, The Canadian Way\"},\"image\":{\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/organicagcentre.ca\\\/#\\\/schema\\\/person\\\/eff274d0d9a060f8fa44abab84a1285f\",\"name\":\"patricia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g\",\"caption\":\"patricia\"},\"url\":\"https:\\\/\\\/organicagcentre.ca\\\/author\\\/patricia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources - Organics Farming, The Canadian Way","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/","og_locale":"en_US","og_type":"article","og_title":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources - Organics Farming, The Canadian Way","og_description":"A zero energy development in agriculture is a farm operation that produces as much renewable energy as it consumes over the course of a year, achieving net-zero energy use through a combination of energy efficiency measures and on-site generation systems like solar panels, wind turbines, or biogas digesters. For Canadian farmers in 2026, this isn&#8217;t just an environmental goal. It represents a practical path to energy independence, predictable operating costs, and access to substantial federal and provincial funding programs designed to support agricultural ...","og_url":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/","og_site_name":"Organics Farming, The Canadian Way","article_published_time":"2026-09-26T12:12:52+00:00","og_image":[{"width":900,"height":514,"url":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/alberta-farm-solar-wind-sunset.jpeg","type":"image\/jpeg"}],"author":"patricia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"patricia","Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#article","isPartOf":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/"},"author":{"name":"patricia","@id":"https:\/\/organicagcentre.ca\/#\/schema\/person\/eff274d0d9a060f8fa44abab84a1285f"},"headline":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources","datePublished":"2026-09-26T12:12:52+00:00","mainEntityOfPage":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/"},"wordCount":4053,"publisher":{"@id":"https:\/\/organicagcentre.ca\/#organization"},"image":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#primaryimage"},"thumbnailUrl":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg","articleSection":["Resilient Agricultural Infrastructure"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/","url":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/","name":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources - Organics Farming, The Canadian Way","isPartOf":{"@id":"https:\/\/organicagcentre.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#primaryimage"},"image":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#primaryimage"},"thumbnailUrl":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg","datePublished":"2026-09-26T12:12:52+00:00","breadcrumb":{"@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#primaryimage","url":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg","contentUrl":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2026\/09\/zero-energy-farm-developments-canadian-solar-wind-biogas-barn.jpeg","width":900,"height":514,"caption":"A Canadian farmstead with a barn and visible solar panels, a wind turbine, and a biogas digester tank in a prairie landscape."},{"@type":"BreadcrumbList","@id":"https:\/\/organicagcentre.ca\/uncategorized\/zero-energy-farm-developments-eligibility-implementation-steps-and-support-resources\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/organicagcentre.ca\/"},{"@type":"ListItem","position":2,"name":"Zero Energy Farm Developments: Eligibility, Implementation Steps, and Support Resources"}]},{"@type":"WebSite","@id":"https:\/\/organicagcentre.ca\/#website","url":"https:\/\/organicagcentre.ca\/","name":"Organics Farming, The Canadian Way","description":"","publisher":{"@id":"https:\/\/organicagcentre.ca\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/organicagcentre.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/organicagcentre.ca\/#organization","name":"Organics Farming, The Canadian Way","url":"https:\/\/organicagcentre.ca\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/organicagcentre.ca\/#\/schema\/logo\/image\/","url":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2022\/04\/logo.png","contentUrl":"https:\/\/organicagcentre.ca\/wp-content\/uploads\/2022\/04\/logo.png","width":589,"height":392,"caption":"Organics Farming, The Canadian Way"},"image":{"@id":"https:\/\/organicagcentre.ca\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/organicagcentre.ca\/#\/schema\/person\/eff274d0d9a060f8fa44abab84a1285f","name":"patricia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6f194999f020a45e5d5398b6238543672775a6864c52e8311e6e94e44260803c?s=96&d=mm&r=g","caption":"patricia"},"url":"https:\/\/organicagcentre.ca\/author\/patricia\/"}]}},"_links":{"self":[{"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/posts\/4790","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/comments?post=4790"}],"version-history":[{"count":0,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/posts\/4790\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/media\/4785"}],"wp:attachment":[{"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/media?parent=4790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/categories?post=4790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/organicagcentre.ca\/morpheus\/wp\/v2\/tags?post=4790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}